AMLI Park Central is an apartment community under development in Austin’s Mueller neighborhood. AMLI Residential began construction on Park Central in December 2023 on Aldrich Street in Mueller Town Center, the district Catellus master-planned on the old Robert Mueller Municipal Airport and Banbury Development took over in 2025. Framing of the East Building finished in January 2026 and exterior facade work started that July; pre-leasing is set for early 2027 with first move-ins in spring 2027. The ground floor is designed for 10,000 square feet of retail in two 5,000-square-foot suites, each divisible. Planned shared space includes two pools, a 2,500-square-foot sky lounge, a 9,000-square-foot fitness center with an infrared sauna, a library with a speakeasy room and rentable private offices. AMLI is targeting LEED Gold.
Status, November 2026: still under construction, not yet open. AMLI’s AMLI Park Central page (read November 7, 2026) lists 650 apartment homes at 2014 Aldrich St., Austin, TX 78723, with pre-leasing in early 2027, first move-ins in spring 2027, and a September 17, 2026 construction update (scaffolding installed). AMLI’s blog post “A first look at AMLI Park Central” (September 14, 2026) splits the 650 into a 230-apartment East Building, due April 2027, and a 420-apartment West Building (including 11 live/work units), due October 2027, with first move-ins from January 2027 and the last pieces finished in 2028. The two AMLI pages differ on the first move-in month. The year shown here (2027) is the planned opening year, not a completion date. Details checked 2026-11.
Sources for the facts above (checked November 15, 2026): the building’s own website gives 2014 Aldrich St. and 650 apartment homes, says the project is under construction (groundbreaking December 1, 2023) with first move-ins planned for spring 2027, and an image caption calls it a six-story apartment building; Texas TDLR TABS records Mueller V – East (2014 Aldrich Street) and Mueller V – West (4725 Mueller Blvd) as new multifamily construction with approximate apartment counts and an estimated completion date that has already passed. The address and the under-construction status with a 2027 opening are confirmed; the 650 units are confirmed only by the building’s own site (the approximate TABS figures do not reconcile with 650); the floor count was recorded as 6 on November 17, 2026 from the building’s own site (no non-listing source conflicts, but it is not independently confirmed).
More Mueller Buildings
Sorry, unable to load the Maps API.